Emergency Repair of Diabio-Ezo Road Project

Project Details

  • Client: UNOPS/ USAID
  • Location: Southern Sudan
  • Start Date: Sunday, 25 February 2018
  • Completion Date: Sunday, 25 February 2018
  • The contract is for the Emergency Repair of 25km (Km 52 to Km 77) of Dabio – Ezo road in Western Equatorial state, Southern Sudan. 
  • The works involved scarifying existing road to depth of 150 mm, adding average 75mm thick selected murrum from approved borrow pits and reshaping and compacting to form road bed. A layer of 150mm of embankment fill is then dumped from selected marrum, processed and compacted as specified in special provision to the specification. 
  • Other works included construction of 6m span Mushubu bridge deck and laying 900 mm x 2.7 mm CSP culverts including masonry end structures in mortar at several locations along the road corridor.